Greens Industrial Estate

  • Client: Greens Power
  • Site: Greens Industrial Estate
  • Location: Wakefield

Case study story

Details

We were commissioned to remove and replace all external cladding including flashings, trims and existing skylights, along with installing a new galvanised valley gutter with an improved channel to ensure free flow.

All work was carried out from inside the premises via a fixed scaffold walkway.

Works carried out:

  • Removal of all external cladding and replacement with new metal profile cladding sheets, and installation of flashings to the roof, louvre vents and doorways
  • Installation of a new wider, deeper galvanised valley gutter to better suit the roof of the buildings
  • Removal and replacement of existing skylights

Equipment deployed:

  • 4 cladding operatives
  • 3 working-at-height specialists
  • Scissor lift
  • Fixed scaffold