Banner Installation via Rope Access

  • Client: Image Group
  • Site: Number One First Street
  • Date: 2016
  • Location: Manchester

Case study story

Details

We were commissioned by Image Group to install a banner, after Auto Trader agreed a 15-year deal to take over 60,000 sq ft of space at Number One First Street, Manchester.

Works carried out:

First of all the banner, which is approximately 25m x 15m, was prepared on the ground by adding all the bungee cord that was required into the eyelets on the banner.

The banner was then winched up into position, by our specialist rope access operatives, onto the building and attached to a steel cable framework.

Finally the banner was tensioned tight using bungee cords and carbine hooks, this gave the banner a drum skin effect.

Equipment deployed:

2 Specialist Rope Access Operatives

Level 2 Rope Access Supervisor

Mobile Weight Anchor System

High Five with Steven Hardman