Commercial Gutter Works

  • Client: J Mills Contractors
  • Site: 104 The Green
  • Location: Twickenham Greater London

Case study story

Details

Full refurbishment of steel gutter system fitted to a detached self-contained industrial unit.
The existing guttering totaling 200 linear metres was in a severely corroded condition, following a lack of maintenance over recent years.
The build up of silt, grime and debris was causing the gutter to hold water creating pitting and corrosion of the steel lining which in turn formed water ingress issues.

Works carried out:

Our solution was to supply and install a full new rigid lining system using Unifold.
Unifold is manufactured from membrane which is pressure bonded to a galvanised substrate, the resulting laminate forms a composite sheet press formed to the correct profile.
The system is incredibly hard-wearing and carries a 20 year manufactures guarantee. It is pliable enough to mold to any gutter profile and will tolerate changes in temperatures and building movement without splitting or cracking.

Equipment deployed:

22m access platform and full scaffold edge protection